Gideon Koch Project Management using WBSplanner Solution
   
Home
  Start Here   Examples   Info Center   Contact Us  
Login


Build an impressive PM portfolio
including awesome WBS at Sharxly

WBS Planner user and project guideline

Introduction

WBS planner is a powerful tool multi purpose. You can use it for Mandatory requirement, project Functions, Product design, Risk assessments, and Work Breakdown Structure planning  sharing. The advanced WBSplanner tool, enable you to add information to every Work package as well as manage the actual work on a high level concept. For small projects the WBSplanner is used for providing the status of the project.

Overview

This version of free WBSplanner 2 cells in every Work Package, save your data automatically, on your local machine as local Storage. Next time you open this page, your project will show immediately. No need to save it manually. You can remove all existing data stored on your computer using the Remove link on the top right link. You can register to a professional version free of charge, to save your date on our server and share it with others as you modify it!.

WBS Planner user guide

Input: The text box at the bottom define your tree based on TABs. Each TAB constructs a son. WBSplanner check if you use the TAB wrongly an alert will pop up advising you how to fix the error. Clicking the update will save your data locally and update the graph display instantly.

Update:  Displays current changes you made in your text box in the graphic display.

Remove: If you would like to delete your project from your computer, simply click on the remove link found at the top right of the page. After removing the content, leave the page.

How to start a project?

When you have an idea and want to develop it you are starting a project.

 You start to explore your users desires, their mandatory needs, what functions are included, design the product, plan what you need to do and manage it based on schedule and budget plan.

In order to all right, it is good practice to start looking at our examples concerning these phases and fill them for your project. You are welcome to register for our professional plan (free of charge) in order to develop your project steps, in order to present to investors or for your successful project process.


WBSplanner Keys

Update: save and display

TAB a sub package

ALT + S Show editor

ALT + H Hide editor

ALT + < Scroll graphics Left

ALT + > Scroll graphics Right

Backup copy the text

Some Examples See ALL

Buzz Party

Game Release

Home Construction

Best Wedding plan



Join me in LinkedIn
All rights reserved to Gideon Koch 1998-2020