WBS Planner
The place to start
Examples
Info Center
Solutions
Join me on LinkedIn
All rights reserved to
Gideon Koch
2020
Login
Register
Contact us
Remove
WBS Planner
Update
// The first line should include the project name // The second and on at the same level will be the upper level // To add a sub level, use the TAB key // To manage your status and budget, register for free Applications Development Project Management and support Provide project management Provide quality control Conduct meetings and reviews Materials and supplies Travel and living costs Miscellaneous costs Consulting fees and subcontractor costs Contingency Systems development Requirements specifications Conduct information-gathering sessions Prepare logical data model Prepare logical process model Physical design Prepare physical data model Prepare physical process model Online system Prepare detailed design Program and unit test Document Batch system Prepare detailed design Batch update facility Program and unit test Document Reporting system Program and unit test Document Integration Prepare integration plan System integration and test Integrate batch update and reporting system Conduct systems test on batch systems Integrate batch and online systems Conduct systems test on complete system Prepare user documentation Customer Conduct milestone reviews Review and approve deliverables Conduct user training Acceptance testing Prepare acceptance tests Conduct acceptance tests Prepare revisions from acceptance tests Hand over to customer Implementation Prepare implementation plan Provide support for implementation Conduct post-implementation review
Error Found!
Show me where
Fixed