WBS Planner
The place to start
Examples
Info Center
Solutions
Join me on LinkedIn
All rights reserved to
Gideon Koch
2020
Login
Register
Contact us
Remove
WBS Planner
Update
// The first line should include the project name // The second and on at the same level will be the upper level // To add a sub level, use the TAb key // To manage your status and budget, register for free FAA Mission Ver 4.00 Mission Analysis Identify Projected Demand for Services Identify Technological Opportunities Identify Projected Supply of Services Mission Needs Analysis and Assessment Initial Requirements Definition Investment Analysis Initial Investment Decision Planning Analysis Documentation Final Investment Decision Planning Analysis Documentation Rebaseline Decision Solution Development Program Management Program Planning, Authorization, Management and Control Contract and Grant Management System Engineering System Engineering Management System Requirements and Definition Analysis, Design, and Integration Value Engineering Supportability, Maintainability, and Reliability Engineering Quality Assurance Program Configuration Management Human Factors Security System Safety Engineering and Management Other System Engineering Specialties HW/SW Design, Development, Procurement, and Production Hardware Design and Development Software Design and Development HW/SW Integration, Assembly, Test and Checkout Production Engineering Procurement/ Production Physical and Airspace Infrastructure Design and Development Facility Planning and Design Real Estate Physical Infrastructure Airspace Redesign Test and Evaluation System Development Test and Evaluation System Operational Test and Evaluation System Independent Software Verification and Validation Independent Operational Test and Evaluation Documentation Logistics Support Logistics Support Planning Test and Measurement Equipment Acquisition Support and Handling Equipment Acquisition Support Facilities Construction/Conversion/Expansion Support Equipment Acquisition / Modification Support Facilities and Equipment Maintenance Initial Spares and Repair Parts Acquisition Initial Training Implementation Program Management Program Planning, Authorization, Management and Control Contract Management Human Resources Planning and Staffing Engineering Environmental and Occupational Safety and Health Compliance Site Selection and Acquisition Construction Site Preparation, Installation, Test and Checkout Joint Acceptance Inspection/ Commissioning/Closeout Telecommunications Implementation Training In-Service Management Preventive Maintenance/ Certification Preventive Maintenance/ Certification FAA Academy Maintenance Corrective Maintenance Corrective Maintenance System Management Office (SMO) Overhead FAA Academy Maintenance Modifications Maintenance Control Technical Teaming Airway Facility System Specialists Air Traffic Controllers Other staff Watch Standing Coverage Program Support Program Planning, Authorization, Management and Control Contract Management Logistics Supply Support Replenishment Spares Repair Logistics Support Services Support Equipment Maintenance Logistics Support Services Technical Data Maintenance Support Facilities CDLS Contracts In-Service Training Airway Facility System Specialists Air Traffic Controllers Second Level Engineering Program Management & Infrastructure Support NAS Field Support & Restoration Hardware & Software Engineering Support Configuration Management Process Improvement Quality Assurance Information System Security Recurring NAS System Costs Software Licenses Infrastructure Support Hazardous Materials Handling Utilities, Building and Grounds Upkeep and Maintenance Telecommunications Building and Infrastructure Modernization and Improvements Real Estate Management Physical Security Flight Inspections and SIAP Development System Performance Assessment System Operations Travel To and From Sites Disposition Program Management Decommissioning Engineering Environmental Dismantle/Removal Site Restoration/Closeout
Error Found!
Show me where
Fixed