Cost Breakdown Structure CBS

The Cost Breakdown Structure chart goal is to show what should be delivered to the customer at every contact point. This includes the description of the product package from the Product Breakdown Structure that is planned to be delivered. It may contain some more information such as priorities, amount to pay, and much more.
The chart is used later on at the development stage to decide what can be delayed and what is crucial to deliver.
The elements are based on the PBS and are at a higher level to present the deliverable package at every phase. Some more elements may be added such as infrastructure preparation or other customer-oriented activities. This schema is used to communicate between the producer and the client.
The Contract Breakdown Structure chart goal is to show what should be delivered to the customer at every contract point as described in the chart. Each Contract Package includes which parts or Product Packages of the PBS would be delivered as written in the contract of the project. Each of the Contract Breakdown Structure packages has a dictionary description including:
Which part of the project as defined in the Product Breakdown Structure are planned to be delivered to the customer
The due date for delivery
Amount due to pay
Penalties evaluation in case the company needs to postpone the delivery
What should the customer prepare to implement this process?
Reduce penalty cost actions (do you want to know how?).

The Contract Breakdown Structure is one of the project presentations for executive management to analyze the project status.

More WBS Planner Info links

Be preferred and get work without experience

Introduction

WBS Template using WBS Planner

Projects Methods using WBS Planner

Dynamic Work Breakdown Structure Insights

Overview

Product Breakdown Structure PBS

Cost Breakdown Structure CBS

Organization Breakdown Structure OBS

Stage Breakdown Structure SBS

Work Breakdown Structure WBS

Normalization of Work Breakdown Structure

Dynamic Work Breakdown Structure method

Dynamic Work Breakdown Methods

Recourse Allocation Matrix RAM

Portfolio Recourse Allocation Matrix PRAM

Functional Analysis Decomposition and Composition

Risk Evaluation

Alternative (design & performing)

Logistics Consideration

Tests Plans

Input Process Output (InPrO)

Project process

Requirements

System Requirements Specifications

System Concept

Detailed Design

Work Breakdown Structure

FAST InPrO Project Plan

Risk Management

Tracking and Control

Failure Handling

Executive Summary

Workshop: Methods and Tools 2 days




Join me in LinkedIn
All rights reserved to Gideon Koch 1998-2020