Gideon Koch | WBS Planner Info Center | Solution | |||||||||
Home |
|
Login | |||||||||
Tests Plans |
|
Acceptance Test Plan should be defined immediately (or in parallel) to requirements. Unit tests are set during the design process or sometimes only in the project plan as some T.B.D. (To Be Defined) tasks. It is recommended to set for each working package a high-level test remark that should be made. It is recommended that in each stage inserting a Test Comment will be available. The test department will get the list of recommended tests and will prepare complete test scenarios in parallel to the development phase.
|
More WBS Planner Info links
Be preferred and get work without experience WBS Template using WBS Planner Projects Methods using WBS Planner Dynamic Work Breakdown Structure Insights Product Breakdown Structure PBS Organization Breakdown Structure OBS Normalization of Work Breakdown Structure Dynamic Work Breakdown Structure method Dynamic Work Breakdown Methods Recourse Allocation Matrix RAM Portfolio Recourse Allocation Matrix PRAM Functional Analysis Decomposition and Composition Alternative (design & performing) |
Join me in LinkedIn All rights reserved to Gideon Koch 1998-2020 |