Project process

Overview

The following are development project phases:
Requirements
The requirements as defined by the customer and verified with the stakeholders

System Specifications
The product specification as part of the contract

System Concept
The high-level engineering architecture of the product

Detailed Design
The product detailed design to be developed

Dynamic Work Breakdowns Structure
The work packages needed to complete the development
Project Plan
A work plan based on the real need of the product development design

Risk Management
A risk assessment is done at every step for all processes and components

Tracking and Control - a well-defined project plan to know, providing you with
a real status and tasks that did not go as planned
Failure Handling
An analysis of what went wrong, how to mend it, and what are the consequences on the customer

Each process output is required for the next process input. The methods and tools support the process step by step to better completion of the project.


More WBS Planner Info links

Be preferred and get work without experience

Introduction

WBS Template using WBS Planner

Projects Methods using WBS Planner

Dynamic Work Breakdown Structure Insights

Overview

Product Breakdown Structure PBS

Cost Breakdown Structure CBS

Organization Breakdown Structure OBS

Stage Breakdown Structure SBS

Work Breakdown Structure WBS

Normalization of Work Breakdown Structure

Dynamic Work Breakdown Structure method

Dynamic Work Breakdown Methods

Recourse Allocation Matrix RAM

Portfolio Recourse Allocation Matrix PRAM

Functional Analysis Decomposition and Composition

Risk Evaluation

Alternative (design & performing)

Logistics Consideration

Tests Plans

Input Process Output (InPrO)

Project process

Requirements

System Requirements Specifications

System Concept

Detailed Design

Work Breakdown Structure

FAST InPrO Project Plan

Risk Management

Tracking and Control

Failure Handling

Executive Summary

Workshop: Methods and Tools 2 days