Tracking and Control

Tracking and Control

Input
Project plan based on SMART

SMART - Specific, Measurable, Achievable, Realistic and Time based
Process
The best method is to get the status of each task by the Performing Team Member. To do so one has to use a management system that really assists the engineering in their work and as the project progresses, the status is updated - see methods and tools.
Output
A project plan with the actual status of each task as well as an overall Dynamic Work Breakdown Structure for every stakeholder requires this information.

More WBS Planner Info links

Be preferred and get work without experience

Introduction

WBS Template using WBS Planner

Projects Methods using WBS Planner

Dynamic Work Breakdown Structure Insights

Overview

Product Breakdown Structure PBS

Cost Breakdown Structure CBS

Organization Breakdown Structure OBS

Stage Breakdown Structure SBS

Work Breakdown Structure WBS

Normalization of Work Breakdown Structure

Dynamic Work Breakdown Structure method

Dynamic Work Breakdown Methods

Recourse Allocation Matrix RAM

Portfolio Recourse Allocation Matrix PRAM

Functional Analysis Decomposition and Composition

Risk Evaluation

Alternative (design & performing)

Logistics Consideration

Tests Plans

Input Process Output (InPrO)

Project process

Requirements

System Requirements Specifications

System Concept

Detailed Design

Work Breakdown Structure

FAST InPrO Project Plan

Risk Management

Tracking and Control

Failure Handling

Executive Summary

Workshop: Methods and Tools 2 days




Join me in LinkedIn
All rights reserved to Gideon Koch 1998-2020