Detailed Design

Detailed Design

Input
Reviewed and approved System Requirements Specifications (SySRs) document. The document should describe what is required and the essential process the system has to provide.
Concept chart with calculation and restrictions
Risks and alternative consideration
Process
Phase A
High-level design
Decomposition
Interface Dictionary
Modules Dictionary
Phase B
Low-Level Design
Decomposition
Interface Dictionary
Modules Dictionary
Phase C
Composition
Scenario mapping
Requirements verification review
Output
Detail design of the SOW or the project content. This should include charts displaying a description of what should be developing as well as the integration process and unit tests.
A complete Product Breakdown Structure with Module, Interface, and cost evaluation as well as a required infrastructure and inputs to start the work package.
Risks assessments - identify risks, the probability to occur, and consequences if they happen. A set of procedures to reduce the risks and track and the control required.
Alternatives evaluation review to every work package. This should include at least another different process, approach, resources, component, algorithm, etc. to develop the required work package on time, budget as required at a good quality.

More WBS Planner Info links

Be preferred and get work without experience

Introduction

WBS Template using WBS Planner

Projects Methods using WBS Planner

Dynamic Work Breakdown Structure Insights

Overview

Product Breakdown Structure PBS

Cost Breakdown Structure CBS

Organization Breakdown Structure OBS

Stage Breakdown Structure SBS

Work Breakdown Structure WBS

Normalization of Work Breakdown Structure

Dynamic Work Breakdown Structure method

Dynamic Work Breakdown Methods

Recourse Allocation Matrix RAM

Portfolio Recourse Allocation Matrix PRAM

Functional Analysis Decomposition and Composition

Risk Evaluation

Alternative (design & performing)

Logistics Consideration

Tests Plans

Input Process Output (InPrO)

Project process

Requirements

System Requirements Specifications

System Concept

Detailed Design

Work Breakdown Structure

FAST InPrO Project Plan

Risk Management

Tracking and Control

Failure Handling