Gideon Koch WBS Planner Info Center Solution
   
Home
  Start Here   Examples   Info Center   Contact Us  
Login




Risk Management

Risk Management

Input
PBS Product breakdown structure
OBS Organization breakdown structure
SBS Stage breakdown structure
Process
Identify the risks Probability and Consequences. Set a management plan to control risks. For each risk, one should set a date where the review should occur. If the risk (a delay in progress for instance) has occurred, then an alternative action should be launched immediately.
Output
A complete document with all the team members as well as the management layer should be traced and managed.

More WBS Planner Info links

Be preferred and get work without experience

Introduction

WBS Template using WBS Planner

Projects Methods using WBS Planner

Dynamic Work Breakdown Structure Insights

Overview

Product Breakdown Structure PBS

Cost Breakdown Structure CBS

Organization Breakdown Structure OBS

Stage Breakdown Structure SBS

Work Breakdown Structure WBS

Normalization of Work Breakdown Structure

Dynamic Work Breakdown Structure method

Dynamic Work Breakdown Methods

Recourse Allocation Matrix RAM

Portfolio Recourse Allocation Matrix PRAM

Functional Analysis Decomposition and Composition

Risk Evaluation

Alternative (design & performing)

Logistics Consideration

Tests Plans

Input Process Output (InPrO)

Project process

Requirements

System Requirements Specifications

System Concept

Detailed Design

Work Breakdown Structure

FAST InPrO Project Plan

Risk Management

Tracking and Control

Failure Handling

Executive Summary

Workshop: Methods and Tools 2 days




Join me in LinkedIn
All rights reserved to Gideon Koch 1998-2020