When failures occur the fowling should be handled:
1. What went wrong?
2. How we fix it
3. What was the implication on the customer and how we fix it?

Remember!
You are not measured if failures occur, but in the way you handled them!
Output
Recovery Failure Management document based on the three issues above.
The document explains how to handle critical failures. The document should define the above sections with alternatives to cope with the situation.

More WBS Planner Info links

Be preferred and get work without experience

Introduction

WBS Template using WBS Planner

Projects Methods using WBS Planner

Dynamic Work Breakdown Structure Insights

Overview

Product Breakdown Structure PBS

Cost Breakdown Structure CBS

Organization Breakdown Structure OBS

Stage Breakdown Structure SBS

Work Breakdown Structure WBS

Normalization of Work Breakdown Structure

Dynamic Work Breakdown Structure method

Dynamic Work Breakdown Methods

Recourse Allocation Matrix RAM

Portfolio Recourse Allocation Matrix PRAM

Functional Analysis Decomposition and Composition

Risk Evaluation

Alternative (design & performing)

Logistics Consideration

Tests Plans

Input Process Output (InPrO)

Project process

Requirements

System Requirements Specifications

System Concept

Detailed Design

Work Breakdown Structure

FAST InPrO Project Plan

Risk Management

Tracking and Control

Failure Handling

Executive Summary

Workshop: Methods and Tools 2 days




Join me in LinkedIn
All rights reserved to Gideon Koch 1998-2020